TLS Handshake


Before the client and the server can begin exchanging application data over TLS, the encrypted tunnel must be negotiated: the client and the server must agree on the version of the TLS protocol, choose the cipher suite, and verify certificates if necessary. Unfortunately, each of these steps requires new packet roundtrips between the client and the server, which adds startup latency to all TLS connections.





0 ms
TLS runs over a reliable transport (TCP), which means that we must first complete the TCP three-way handshake, which takes one full roundtrip.
56 ms
With the TCP connection in place, the client sends a number of specifications in plain text, such as the version of the TLS protocol it is running, the list of supported ciphersuites, and other TLS options it may want to use.
84 ms
The server picks the TLS protocol version for further communication, decides on a ciphersuite from the list provided by the client, attaches its certificate, and sends the response back to the client. Optionally, the server can also send a request for the client’s certificate and parameters for other TLS extensions.
112 ms
Assuming both sides are able to negotiate a common version and cipher, and the client is happy with the certificate provided by the server, the client initiates either the RSA or the Diffie-Hellman key exchange, which is used to establish the symmetric key for the ensuing session.
140 ms
The server processes the key exchange parameters sent by the client, checks message integrity by verifying the MAC, and returns an encrypted "Finished" message back to the client.
168 ms
The client decrypts the message with the negotiated symmetric key, verifies the MAC, and if all is well, then the tunnel is established and application data can now be sent.

TLS Parameters -
http://www.iana.org/assignments/tls-parameters/tls-parameters.xhtml

Source - oreilly.com


Popular posts from this blog

Availability of 5 GHz WLAN Channels in India under unlicensed band

Availability of 5 GHz WLAN Channels in India under unlicensed band  In India, Wireless Planning and Coordination Wing of Department of Telecom, under Ministry of Communication takes care of licensing of radio frequencies.  In the latest National Frequency allocation plan 2018 (https://dot.gov.in/sites/default/files/NFAP%202018.pdf), Government of India (GoI), exempted the licensing requirements of the following radio frequency ranges for wireless usage and a gazette notification has also published for this (https://dot.gov.in/sites/default/files/License%20Exemption%20in%205%20GHz%20G_S_R_1048%28E%29%20dated%2022nd%20October%2C%202018_0.pdf)  -- 1.  5150-5250 2. 5250-5350 3. 5470-5725 4. 5725-5875 References

Why we have IPv6 after IPv4..... Where is IPv5 ?

IP or Internet Protocol, is the primary network protocol used on the Internet, introduced by Vint Cerf and Bob Kahn in 1974. IP version 0 to 3 was introduced and used between 1974 and 1979. After changes and refinements in initial IP protocol, version 4 was introduced in 1981, commonly known as IPv4, described in RFC 791 , which become the backbone of Whole Internet in no time. (IPv4 is know as v4 because it is the fourth version of IP not because it has 4 octets, which is a common myth). TCP/IP Protocol was designed as a part of project ARPANET, whose aim was to interconnect various universities and research institutes of USA. But with the dot com boom, TCP/IP grows like anything and its become a victim of its own success. In Early 90's, expert realized that we will exhaust the whole IPv4 number very soon and there is a need for a new protocol, which should be enough in size to serve the internet community for at least 30-40 years. This lead to new version of Internet Protoco...

Summary report of APNIC 55 (APRICOT 2023) Meeting held in Manila, Philippines

APNIC Logo The APNIC 55 meeting was held in Manila, Philippines from 20th Feb to 02nd March 2023. The meeting was hosted by PhNOG, The Philippine Network Operators Group (PhNOG) and supported by DOST- Advanced Science and Technology Institute. Every year, APNIC conferences are held twice, the first of each year is held in conjunction with APRICOT and the second one is a standalone conference. The last such meeting held in India was in 2012, APNIC 33 (which was in conjunction with APRICOT 2012).  APNIC 55 meeting was unique in multiple senses –  i. Firstly, because of the possibility of potential hijack [1] [2][3] of the APNIC Executive Council by Cloud Innovation Ltd. / Larus foundation / NRS, the same organizations which have dragged AFRINIC (RIR for African Continent) into the Mauritius supreme court and at one point nearly halted the AFRINIC operations by getting its bank accounts frozen (over 25 lawsuits have been filed against AFRINIC by Cloud Innovation Ltd....